CHOPIN INTERNATIONAL MUSIC CENTRE
-
location: żelazowa wola, poland
program: concert hall, conference centre, educational facilities, practice chambers
area: 10,035 m2 gfa
status: competition, 2018
client: the fryderyk chopin institute
team: -
collaborator: acoustic consultant: acoustic logicTo intervene in a planted park exacerbates the fact that the perception of any building will differ drastically through the seasons. Its presence will be more or less evident, made more or less pregnant. In no instance, should it ever be an unwelcome disturbance to the pre-existing balance. For that reason, the project cannot be a monolith. We thus propose to translate the programmatic and functional requirements of the brief into 3 delicate fragments of a scale not entirely foreign to the current ecosystem. They form an assemblage that is cemented by the park. Not an intruder, it seems as though the International Music Centre was always part of the village fabric that inhabits the ecological park.
As per the brief requirements, the concert hall, the education facilities and the conference centre are to occupy separate areas within the Music Centre. We take this idea further and propose to accommodate each one in a separate volume:
The bigger mass houses the main programmatic organ, the auditorium. It is directly oriented towards Chopin’s house.
The second building constitutes the functional and physical heart of the composition: it accommodates the entrance to the complex, the chamber hall as well as the educational facilities and the offices.
The necessary physical connections between these two fragments are facilitated by a virtually invisible 2-storey plinth embedded into the topography and that accommodates the parking on the lower level and the lobby, foyer and the rehearsal rooms on the semi-buried ground floor.
The third component is a linear volume that sits parallel to the Utrata river and houses the conference centre.
The proposed massing not only allows for the right scale of insertion of the project within the park; it invites the visitor to use the park between the fragments as the antechamber of the Music Centre. All public spaces such as the exhibition hall are directly accessible from the antechamber, creating a seamless relation between interior and exterior and offering the opportunity to use the park as an extension of the Music Centre where various outdoor events can be hosted.
We propose the use of rammed earth as a main construction and finishing material for the International Music Centre.
木々が広がる自然豊かな公園に介入するということは、建物の存在感が季節によって大きく変化するということでもあります。そのボリュームは、周辺環境の変化に応じて顕著になったり、控えめになったりしますが、いかなる場合でも、既存のバランスを乱すような不快な存在であってはなりません。そのため、本提案では我々はプログラム上の条件を一つの巨大な塊としてではなく、環境に違和感なく溶け込む版築で覆われた3つの小さい単位に落とし込むことを提案しています。これら断片化された音楽ホールは、公園のランドスケープによって結ばれ、まるで以前からこの場所にあったかのように、景観の一部となることを想定しています。
要求された設計条件に従い、コンサートホール、教育施設、会議センターは、それぞれ別々に配置される必要があります。我々はこのアイデアをさらに発展させ、各施設を個別の建物として計画することを提案します。
最も大きな建物には、主な機能であるオーディトリアムが収容され、ショパンの家に向かって配置されています。
2つ目の建物は、複合施設の機能的および物理的な中心を構成し、エントランスホール、チェンバーホール、教育施設、オフィス等を収容します。
これら2つの要素間の接続は、ほとんど見えない2層の基壇によって達成されており、下層には駐車場、半地下の1階にはロビー、ホワイエ、リハーサル室が配置されています。
3つ目の構成要素は、ウトラタ川に並行して配置された線状の建物で、会議センターを収容します。
この提案された配置は、プロジェクトを公園内に適切なスケールで挿入することを可能にするだけでなく、建物の断片のあいだに広がる公園を、音楽センターの前庭として利用することを可能とします。展示ホールなどの公共スペースは、この前庭から直接アクセスでき、屋内と屋外のシームレスな関係を生み出し、様々な野外イベントを開催するための場を提供しています。